Nhan Luat Provides Steel for 9 Key Transportation Projects to be Completed in 2023

There's a total 11 main transportation projects completed and used in 2023, including: My Thuan 2 Bridge, Terminal T2 of Phu Bai Airport, My Thuan - Can Tho Expressway, Vinh Hao - Phan Thiet Expressway,... Nhan Luat Corporation is honored to participate in providing steel for 9 projects out of a total of 11 main transportation projects completed in 2023

Tuyen Quang - Phu Tho Expressway

Opening on December 24, the Tuyen Quang - Phu Tho Expressway is value VND 3,753 billion. This project is invested by Tuyen Quang Transportation Construction Investment Project Management Board. According to the initial planning, phase 1 of the project will be implemented with 2 lanes, speed of 80km/h, then phase 2 will continue with 4 lanes.

Dau Giay - Phan Thiet Expressway:

The expressway with a length of 99km, started construction on September 30, 2020 with a total investment of more than 12,500 billion VND, and was opened to use on April 29.

This project has a starting point connecting with Vinh Hao - Phan Thiet Expressway in Ham Thuan Nam district and an ending point at the Ho Chi Minh City - Long Thanh - Dau Giay Expressway intersection in Thong Nhat district, Dong Nai province. The Ministry of Transport allows a maximum speed of 120 km/h and a minimum speed of 60 km/h

This road helps shorten the time from Ho Chi Minh City to Phan Thiet to about 2 hours compared to 4-5 hours as before.

Terminal T2 Phu Bai Airport:

The project started construction in December 2019, invested by Vietnam Airports Corporation with a total investment of about 2,300 billion VND. The project was inaugurated on June 17.

The project has a construction floor area of about 22,380 m2, capacity to serve 5 million passengers per year (including 4 million domestic passengers), and can serve 2,500 passengers during peak hours. The highlight is Hue royal architecture with overlapping layers of roofs expressing the desire to rise.

This is a key infrastructure project in the air transport development plan for the period up to 2020 and orientation to 2030. The project helps improve Phu Bai port's operating capacity to reach level 4E; Meet the travel needs of local people, attract tourists and investors; creating new driving force to promote economic growth of Thua Thien Hue province as well as the region

My Thuan 2 Bridge:

After more than 3 years of construction, the investment project to build My Thuan 2 bridge connecting the two provinces of Tien Giang - Vinh Long and the road leading to both ends of the bridge was inaugurated on December 24.

The main bridge section is 1,906km long, fully invested with 6 lanes, design speed of 80km/h, with a bridge surface width of 25m; The main span of cable-stayed structure is 650m long; The lead span of the Super T beam bridge and balanced cantilever box beam is 1,276m long. This is a component project of the North - South Eastern Expressway for the period 2017 - 2020 approved by the Ministry of Transport. The total project investment is 5,003 billion VND, of which, construction and equipment costs are more than 3,389 billion VND. The project is invested with state budget capital

Provincial Road 155 connecting Hanoi - Lao Cai Expressway

Provincial Road 155 connects to Sa Pa town, passing through the Mong Sen viaduct, which began operating after 5 years of construction from September 22.

With a total length of 13.8 km, Provincial Road 155 has its starting point at the intersection with the highway located in Lao Cai City, ending point at Mong Sen bridge, Tung Chai commune, Sa Pa town, with an investment cost of 1,500 billion VND. . The entire route has 6 bridges, of which Mong Sen is 612m long with 5 continuous spans, 14m wide surface, 4 lanes. With a height of 83m, it is the highest viaduct in Vietnam

Mai Son - Thanh Hoa Expressway:

On April 29, the North-South Expressway project in the East, the Mai Son - Highway 45 expressway section with a length of more than 63km connecting Ninh Binh province to Dong Son district, Thanh Hoa with a total investment of more than 12,000 billion VND was inaugurated. wall. The project passes through the districts of Yen Mo, Hoa Lu, Tam Diep City (Ninh Binh) and the districts of Ha Trung, Vinh Loc, Yen Dinh, Thieu Hoa, Dong Son, Trieu Son, Nong Cong, Thanh Hoa City

Highway 45 – Nghi Son:

Continuing with the above project is Highway 45 - Nghi Son. The project opened to traffic in early September with a length of 43.28km, total investment of more than 5,500 billion VND, invested by Project Management Board 2, starting from July 2021. The northern end of the project connects to the Mai Son - National Highway 45 highway section at the Dong Xuan intersection (Dong Son district), the southern end connects to the Nghi Son - Dien Chau highway section in Tan Truong commune (Nghi Son town).

Nghi Son – Dien Chau Expressway:

Opened to use on September 2, the Nghi Son - Dien Chau project. This highway is 50km long, of which the section passing through Thanh Hoa is 6.5 km and Nghe An is 43.5 km. The starting point is at Nghi Son, connecting to National Highway 45 - Nghi Son and the ending point is at Dien Thap commune (Dien Chau, Nghe An), at the intersection connecting to Dien Chau - Bai Vot highway. The project has a total investment of more than 7,290 billion VND, of which the total construction value is about 4,400 billion VND

Nha Trang – Cam Lam Expressway:

Nha Trang - Cam Lam Expressway is invested in the form of PPP (public-private partnership), with a route length of 49.1km, 4 lanes, speed of 80km/h, 17m wide roadbed and no emergency stop lane. The project started construction in September 2021 with a total investment of 5,524 billion VND

Vinh Hao – Phan Thiet Expressway:

Vinh Hao - Phan Thiet Expressway has a length of 100.8 km, the starting point is at Vinh Hao commune, Tuy Phong district, Binh Thuan, connecting with the Cam Lam - Vinh Hao expressway and the ending point intersects with the road to My Thanh in the commune. Ham Kiem, Ham Thuan Nam district, connected to Phan Thiet - Dau Giay highway. Phase 1 of the project is designed to have only 4 lanes, without continuous emergency stopping lanes. Roadbed width 17m, design speed 80km/h. In the complete phase, it will be invested in 6 lanes, roadbed width of 32.25m, design speed of 120km/h

My Thuan – Can Tho Expressway:

My Thuan - Can Tho Expressway is 23km long, passing through two provinces of Vinh Long and Dong Thap. The project has a total investment of more than 4,800 billion VND, starting in January 2021. In phase 1, the project has 4 lanes, design speed of 80km/h. When completed, the road will be designed with 6 lanes and a speed of 100km/h. The starting point of the highway connects to My Thuan 2 bridge, the end point is Cha Va intersection (Binh Minh town, Vinh Long province), about 5km from Can Tho bridge. This highway opened to traffic on December 24

Nhan Luat Corporationy was selected as a steel supplier for transportation projects in the area is a great honor for the Company. The trust and choice from investor partners and contractors proves the reputation and quality of Nhan Luat Corporation in the field of providing construction steel. This is not only based on the ability to deliver quality and reliability but also an appreciation of the ability to meet the technical and time requirements of projects.

Nhan Luat Corporation is the leading industrial and construction steel distributor in Vietnam. The company's market spans North - Central - South with companies in the same system including: Nhan Luat Corporation, Northern Nhan Luat JSC and Southern Nhan Luat Steel SJC, Vung Tau Branch and Representative Office in the Southweast